Recent Projects
Inspired Engineering
We staff highly-qualified engineers who bring years of experience and the most advanced technical certifications to every engagement.
Innovative Technology
By partnering at the highest levels with the industry’s most respected manufacturers, we can deliver the right products for your environment with the most aggressive pricing possible.
Project Methodology
Our Project Managers are experts at strategic and tactical planning, project costing, risk identification and management, and implementation and control.
Recent
Archives
Recent Project
Virtual Machine Migration to Microsoft Hyper-V
Modernizing Legacy VMware Infrastructure with a Highly Available Microsoft Hyper-V Platform
Replacing Legacy Virtualization with a Modern Migration Strategy
This local bank needed to modernize its aging virtualization environment to eliminate operational risk, improve resiliency, and create a scalable platform for future growth. The bank’s existing infrastructure relied on a single-host VMware deployment that lacked high availability, centralized storage, and full vendor support. Because every production workload depended on a single physical server, planned maintenance or unexpected hardware failures had the potential to disrupt critical business operations.
Beyond resiliency concerns, the legacy environment was becoming increasingly difficult to maintain. Storage utilization continued to grow, inactive virtual machines consumed valuable resources, and the unsupported VMware platform limited access to security updates and vendor support. The existing architecture also lacked a clear path for future expansion or integration with planned backup and disaster recovery initiatives.
To address these challenges, the bank partnered with Data Networks to perform a comprehensive virtual machine migration while replacing the legacy VMware environment with a modern Microsoft Hyper-V platform designed for long-term performance, scalability, and business continuity.
Delivering a Seamless Virtual Machine Migration
Data Networks designed and deployed a new enterprise virtualization platform built on two HPE ProLiant servers, HPE MSA shared storage, and redundant Juniper Networks top-of-rack switching. The new Microsoft Hyper-V cluster eliminated the single point of failure that existed within the previous environment while providing continuous availability for critical business systems.


The engagement began with a detailed planning and assessment phase, during which Data Networks validated the virtual machine inventory, identified supported workloads, developed migration sequencing, and established rollback procedures to minimize business disruption.
Engineers then installed the new rack infrastructure, UPS systems, rack-mounted power distribution units, HPE servers, shared storage arrays, and redundant Juniper switching infrastructure. The networking environment was configured using Virtual Chassis technology with dedicated 10GbE connectivity for storage, compute, and future backup traffic, ensuring high-performance communication throughout the environment.

Following infrastructure deployment, Windows Server Core was installed and configured on each Hyper-V host. Data Networks configured Storage Spaces integration using Cluster Shared Volumes (CSV), implemented Multipath I/O (MPIO), established highly available cluster networking, and validated storage connectivity and failover capabilities before beginning workload migration.
The virtual machine migration itself was executed in carefully planned phases. Infrastructure services were migrated first, followed by mid-tier application servers and larger production workloads. After each migration phase, Data Networks validated system functionality, network connectivity, application performance, and storage operations to ensure every workload operated successfully within the new Hyper-V environment. Legacy VMware dependencies were then removed once all production systems were fully operational.
Creating a Future-Ready Virtualization Platform
Upon completion, the virtual machine migration successfully transitioned the bank from an unsupported single-host VMware environment to a resilient, fully supported Microsoft Hyper-V platform capable of supporting future business growth.
The new architecture significantly improved infrastructure resiliency by eliminating hardware-related single points of failure while enabling high availability during planned maintenance and unexpected outages. Centralized shared storage and redundant networking improved application performance, optimized storage utilization, and simplified day-to-day infrastructure management.

The solution also positioned the organization for long-term success by leveraging fully supported Microsoft, HPE, and Juniper technologies that provide ongoing vendor support, enhanced security, and lifecycle management. With the migration complete, the environment is now prepared for future enhancements, including enterprise backup integration, disaster recovery expansion, and additional virtualization growth.
Data Networks concluded the project by providing comprehensive as-built documentation, updated network and infrastructure diagrams, operational documentation, and knowledge transfer sessions that equipped the bank’s IT staff to confidently manage the new virtualization environment.
By delivering a carefully planned virtual machine migration, Data Networks helped the organization modernize its data center, reduce operational risk, improve business continuity, and establish a scalable infrastructure capable of supporting evolving business and technology requirements.