Recent Projects
Inspired Engineering
We staff highly-qualified engineers who bring years of experience and the most advanced technical certifications to every engagement.
Innovative Technology
By partnering at the highest levels with the industry’s most respected manufacturers, we can deliver the right products for your environment with the most aggressive pricing possible.
Project Methodology
Our Project Managers are experts at strategic and tactical planning, project costing, risk identification and management, and implementation and control.
Recent
-
Q4 2022
Cloud Migration
-
Q4 2022
Security Camera Project
-
Q4 2022
AV Equipment Installation
Archives
Recent Project
S2D Cluster to Replace HPE
Hyper-V Cluster Deployment for Orange Water and Sewer Authority
OWASA’s configuration at their Waste Water Treatment Plant consisted of Microsoft’s Hyper-V clustered on an HPe StoreVirtual Virtual Storage Appliance (VSA). The software-defined hyper-converged solution was recently announced to be reaching its end-of-support lifecycle in HPe’s portfolio. Additionally, OWASA’s data capacity needs were growing beyond the expandable capabilities of the VSA, and local networking capabilities were limited to 1 GbE of traffic. OWASA needed a solution that could scale both horizontally and vertically.
Data Networks recommended and implemented a Microsoft Hyper-V cluster deployment leveraging Microsoft Server 2019 Data Center Edition, replacing the existing cluster hosts systems with new Dell R640 servers. Additionally, Data Networks deployed a new pair of Juniper switches as a “Top-of-Rack/LAN & SAN Aggregation layer,” creating a modern, scalable solution with more dynamic performance to meet OWASA’s IT capacity requirements.
Tags: SLG, local, government, agency, hyperconverged, HCI